The dump truck, at 45 tons, ascends the 13-percent grade and takes on 65 tons of ore. With more than double the weight going back down the hill, the beast's regenerative braking system recaptures more than enough energy to refill the charge the eDumper used going up.
The 1963 Černý Důl – Kunčice nad Labem aerial ropeway is over 8 km (5 mi) long, over 30 m high in places and carries 135 tons of limestone every hour from a quarry to the nearest train station. Its 120kW 3-phase synchronous motor requires power for a few minutes at the start and end of each day when most of the 800kg-capacity trolleys are empty, and spends most of the shift generating mains electricity and acting as a speed governor. Unlike the EV, it is fully autonomous most of the way, only 5 people are required to operate it including loading and unloading. The quarry will continue operation as long as it pays off, then the ropeway will be scrapped (projected 2033). A dude illegally rode the way up on it somewhat recently.
Marl is an earthy material rich in carbonate minerals, clays, and silt. When hardened into rock, this becomes marlstone. It is formed in marine or freshwater environments, often through the activities of algae.
Very interesting use case but kind of dependant on this very specific setup? I feel like an even more efficient and low maintenance method would be like... a ramp.
I'm no phycisist but I'd bet that the claim "it consumes no energy" is almost certainly false. I get what they mean but this isn't exactly a honest way to describe it.
Back in my day we drove back and forth to work uphill, both ways, and we only lost weight because we could never afford enough Starbucks and avocado toast!